Crypto Market Intelligence Platform
Structure the Market.Remove the Noise.
AriSai Quant brings systematic trend, valuation, derivatives, liquidity, macro intelligence and portfolio rotation together in one research platform.
Free account · 7-day delayed dashboard data · No card required

Inside the Dashboard · Elite
Explore the AriSai Rotation Systems
Four systematic rotation models. Current model states, transparent allocation targets, and historical research — in one dashboard.
Main ensemble · Simurgh
Three models. One adaptive allocation.
Simurgh combines the independent Shahin, Darya and Cyrus models into a rule-governed portfolio target, with visible source influence and rebalance controls.
- See model target weights and cash exposure
- Inspect source-system influence
- Review completed-bar decisions and next-open execution rules
Click the screenshot to examine the complete captured dashboard.
System 1 · 2 · 3
Independent decision logic.
Compare Shahin, Darya and Cyrus side by side. Each system has its own model engines, asset qualification rankings, filters and defensive allocation states.
- Three distinct systematic models
- Engine-level states and asset rankings
- Rules-based risk and defensive modes
Click the image to expand the side-by-side dashboard comparison.
Historical transparency
Go beyond the current signal.
Explore historical model-state changes and simulated portfolio results alongside BTC and ETH buy-and-hold reference curves.
- Visual model allocation history
- Historical backtests with explicit costs
- Benchmark comparisons and risk metrics
Historical performance shown is simulated research, not realized trading returns or evidence of future results.
AriSai Quant · Beyond Rotation
More Than Rotation. Complete Market Intelligence.
Explore trend, liquidity, macro and derivatives conditions through purpose-built quantitative research tools — all in one workspace.
01 · Market structure
Trend & Market Risk
Put price trends, momentum, volatility and cross-asset risk conditions into context with systematic indicators.
02 · Monetary context
Liquidity & Macro
Study dollar liquidity, global monetary conditions and macro indicators alongside the changing crypto market environment.
03 · Positioning context
Derivatives Intelligence
Examine open interest, funding and realized liquidations to understand derivatives positioning and market activity.
Feature illustrations are conceptual. Available indicators, data freshness and access depend on the selected dashboard tab and membership tier.
Built for Transparent Quantitative Research
Access the Dashboard
Evaluate AriSai Quant’s systematic models.
No predictions. No discretion. Just rules, structure, and risk control.
